Skip to content
Skycrest Homes
The original bathroom before the remodel, with an oak vanity and a corner jetted tub

Bathroom Remodel · Elmhurst

Bathroom Remodel in Elmhurst

An Elmhurst bathroom taken back to the studs and rebuilt, documented from the existing tub and shower through demolition to the finished room.

Back to the studs, then rebuilt

This gallery is unusual because it starts before the work did. The original shower, tub, toilet and vanity were all photographed first, then demolition, then the room in stages as it came back together. You can see exactly what was there and exactly what replaced it.

Older suburban bathrooms hide things, and what is found behind the tile in the first two days usually decides how the rest of the job goes. Opening a room with a fair idea of what is likely back there is the difference between a schedule that holds and one that quietly slips.

The short version

Type
Bathroom Remodel
Where
Elmhurst, IL
Scope
Bathroom stripped to the studs and rebuilt
Photographs
23
What we build in Elmhurst

Before and after

The same corner, before and after

Both frames are shot from the bathroom doorway, so the window on the back wall and the vanity run on the right line up between them.

The original bathroom before the remodel, with an oak vanity and a corner jetted tub Before
Finished bathroom with two walnut vanities facing each other and a freestanding tub between After
The corner tub and the old vanity came out; the window stayed where it was and the room was replanned around it.

Worth noticing

Three things about this one

  • Existing shower, tub, toilet and vanity photographed before demolition

  • The room documented in stages through demolition and rebuild

  • Paint colors selected and recorded alongside the finished images

Ask what this one cost

We can tell you the budget, the schedule and what went sideways on the way. Every job has something. The useful question is what happened next.