Bathroom Remodel · Elmhurst
Bathroom Remodel in Elmhurst
An Elmhurst bathroom taken back to the studs and rebuilt, documented from the existing tub and shower through demolition to the finished room.
Back to the studs, then rebuilt
This gallery is unusual because it starts before the work did. The original shower, tub, toilet and vanity were all photographed first, then demolition, then the room in stages as it came back together. You can see exactly what was there and exactly what replaced it.
Older suburban bathrooms hide things, and what is found behind the tile in the first two days usually decides how the rest of the job goes. Opening a room with a fair idea of what is likely back there is the difference between a schedule that holds and one that quietly slips.
The short version
- Type
- Bathroom Remodel
- Where
- Elmhurst, IL
- Scope
- Bathroom stripped to the studs and rebuilt
- Photographs
- 23
Before and after
The same corner, before and after
Both frames are shot from the bathroom doorway, so the window on the back wall and the vanity run on the right line up between them.
Before
After
Worth noticing
Three things about this one
-
Existing shower, tub, toilet and vanity photographed before demolition
-
The room documented in stages through demolition and rebuild
-
Paint colors selected and recorded alongside the finished images
Ask what this one cost
We can tell you the budget, the schedule and what went sideways on the way. Every job has something. The useful question is what happened next.