Skip to content
Skycrest Homes
Custom home built by Skycrest Homes in the Chicago suburbs

Barrington, Illinois

Custom Home Builders in Barrington

Four finished Skycrest houses in Barrington and a shop twenty minutes from the village. Bring us the lot before you close on it, not after.

In Barrington the lot decides the house before the plan does

Barrington is really three building conditions wearing one name. Inside the village you get water and sewer, a surveyed rectangle and a tree ordinance that means the oaks on your lot are not yours to remove. Push out toward Cuba Road and the lots get to an acre and more, the water comes from a well and the waste goes to a septic field that has to perc before anything else matters. And a strip of the village drains to Flint Creek, where the floodplain line moves your foundation whether you like it or not.

None of that is visible in a plan set. It is visible on the lot, which is why the first thing we do here is review it and give you feedback, preferably before you own it. A soil boring and a perc test cost a few thousand dollars. Finding out after closing that the buildable envelope is half what you assumed costs considerably more than that.

The number to get first

Not the price per square foot. The site cost: well, septic, grading, tree protection and the driveway. On a Barrington acre that number swings by six figures from one lot to the next, and it is the number that decides whether your house fits your budget.

Call (847) 380-8212

Custom Home Building

What building a custom home here actually involves

You are not buying a product off a shelf. You are hiring someone to run a two-year project on your behalf, and the part that decides how it goes is the part that happens before a shovel moves.

  • We sit with you and your architect while the plans are still changeable, so the drawings and the budget are the same document.
  • Village of Barrington review, Lake or Cook County health department for septic, and the tree protection plan are all ours to run, not yours.
  • One contract, one builder, one phone number. Our team is on your site, not dispatching from an office.
Front elevation of a Skycrest Homes custom home

Questions

Asked in Barrington

Something not answered here? Call (847) 380-8212 and ask us directly.

Do I need a well and septic in Barrington?

It depends which side of the village boundary your lot is on. Inside the village you are almost always on municipal water and sewer. Out toward Cuba, Hillside and the unincorporated edges you are on a private well and a septic field, which means a perc test before design and a county health department permit before construction. We find out which one you are on during the lot walk, because the answer changes the budget by a lot.

Can I take the oak trees out to fit the house I want?

Usually not, and usually you would not want to. Barrington protects mature trees, so removals need approval and often replacement planting. In practice the oaks are the reason the lot is worth what it is worth, so the more useful move is to site the house around them. We mark the keepers and the protection zones before the house is positioned, not after.

How long does a custom home in Barrington take?

Figure twelve to sixteen months of construction once permits are in hand, and three to six months of design, engineering and approvals before that. Septic and floodplain review add time at the front. Anyone quoting you a number without having seen the lot is guessing.

Will you build on a lot I already own?

Yes, and that is the easier conversation because the unknowns are already yours to see. Send the plat and the address and we will review it and give you feedback. If the lot has a problem we will tell you what it is before you spend money on drawings.

On the map

Where Barrington is

Lake and Cook Counties. Close enough that a site visit is a drive, not a trip.

Building or remodeling in Barrington

Tell us the address and what you are thinking about. You will get a straight answer on whether it works, what it costs and how long it takes, including when the answer is no.